2017可再生能源拍卖机制第七次招标

Latest News & Update

Respondents are encouraged to check this Request for Offers (“RFO” or the solicitation) Website periodically for updates, notices, and postings. SDG&E, 自行决定, 并遵照CPUC的命令, 可能会更改条款, 本次招标的要求和时间表. Respondents should monitor the RFO Website for announcements regarding any updates or changes including posted questions & answers. SDG&E将张贴所有征集公告, 包括对本网站的时间表更改或《全球十大博彩公司评级》修订. In particular, participants should check the RFO website for details on the pre-bid conference call and posting of answers to submitted questions.

  • 2017年8月29日-根据RAM VII RFO协议,可持续发展目标&在可持续发展目标之前,E不会列出任何投标人的候选名单&E’s pending Petition for Modification and Application for Modification are resolved.  CPUC释放了一个 建议决定(PD) on SDG&但是,这个过程还没有完成.  PD预计将于2017年9月28日举行听证会 CPUC meeting. SDG&当PFM和AFM被CPUC解决后,E将更新此通知.
  • 06/29/2017 - The FAQ document 已更新
  • 06/26/2017 -全部 Q&A 到目前为止已收到答复
  • 06/20/2017 - The FAQ document 已经创建了第一组问题和答案
  • 2017年6月16日-投标人会议 slides and recording 现在可以买到
  • 06/02/2017 -预定发布

SDG&E的2017年RFO寻求可再生能源购买协议

San Diego Gas & 电力公司(SDG&E”) is issuing this Renewable Auction Mechanism (“RAM”) solicitation pursuant to the California Public Utilities Commission (“CPUC”) direction in 决议e - 4783, that SDG&我们将举行RAM VII招标.  2016年10月27日,可持续发展目标&E提出了两项法律挑战, 修订申请(AFM)及修订呈请书(PFM), with the CPUC seeking to terminate further procurement obligations under the RAM program.  SDG&在CPUC对SDG做出裁决之前,E不会将任何投标列入候选名单&E正在等待AFM和PFM.  此外,如果CPUC批准可持续发展目标&E的AFM和/或PFM,可持续发展目标&E保留不从本招标公告中收到的投标中采购的权利.  或者,如果CPUC拒绝SDG&E的AFM和/或PFM,并根据本RFO和SDG收到的投标指导采购&E将继续进行投标入围名单.  RAM程序是由Decision创建的 D.10-12-048 and revised by D.14-11-042 (和RAM Decision一起),它设置程序参数.

The RAM Decision requires that this solicitation be for Renewables Portfolio Standard (“RPS”) eligible resources located in the California Independent System Operator (“CAISO”) control area, 包括动态转移到CAISO的资源.  SDG&E邀请所有规模大于0的项目.5兆瓦ac参与,并指出其RAM计划容量目标是107.3 MW.  所有项目至少需要进行第二期互连研究, 或者动态转移的项目, 来自管理平衡机构(“BA”)的同等学习水平. 投标将根据可持续发展目标进行评估&E的净市值(“NMV”)最小成本最佳拟合(“LCBF”)方法.

如欲了解更多详情,请参阅RAM VII征求协议.

征集协议:

Details regarding the solicitation process and eligibility requirements are provided in the RFO document RAM VII协议文档.

所需表格及文件:

  1. Offer Form -可提交的表格数目没有限制. Therefore, 鼓励受访者, 提交额外报价供考虑, 比如较短期限的报价或自动扶梯.
  2. Interconnection Agreement or Phase II Interconnection Study (or distribution level equivalent) and / or Fast Track Documentation -提交最近完成的互连协议副本, 第二阶段互连研究或同等快速通道文件.  对于通过伪绑定动态转移到CAISO的项目, submit copies of a completed Phase II interconnection study (or BA equivalent) and provide documentation certifying the existence of the dynamic transfer arrangements.
  3. 现场控制文件 - Submit copies of site control documents demonstrating: a) direct ownership; b) a lease; or c) an option to lease or purchase upon PPA approval (must be an exclusive option to the Bidder that will last until the completion of the RFO cycle).
  4. Site Maps - Submit copies of all project maps showing location, facilities, layout, Interconnection, etc. 项目单线图.
  5. Resource Report - please submit a verifiable fuel resource plan describing how and why the respondent believes the natural resource for the project will produce as expected. For example, 太阳能和风能, developers will typically use temporary onsite equipment to take measurements and then calibrate those to long term satellite data. Programs such as PVSyst or OpenWind may then be used to calculate the radiation at the panel or wind turbine. 沼气、生物质和地热项目通常进行类似的研究. SDG&E prefers these reports come from a recognized third party company who specializes in these matters. Since energy deliveries from RPS projects are used for planning purposes, it is imperative that SDG&E相信产量估计是准确的. 本报告是可持续发展目标的一部分&E’s qualitative evaluation of the project and its viability and ability to deliver as expected.
  6. 全pv系统模型(仅限太阳能) - the full PVSyst file must be submitted by exporting the entire project that contains the prj, met, inv, pan, etc. files as a .zip file. 请不要提交pdf文件.

参考表格及文件:

This solicitation employs a non-modifiable Power Purchase Agreement (“PPA”) structure.  这些文件由CPUC预先批准,任何SDG都不得更改&E或中标人.  只有空白处可以填写项目的具体信息.  所有答复者应仅根据这些协议的条款提交投标.  Please do not submit a bid with the hopes that the non-modifiable PPA will be changed.  

RFO回应说明:

答辩人必须通过PowerAdvocate®以电子方式提交其报价, 并随附所需表格及投标资料.  所有优惠必须不迟于以下日期上传至PowerAdvocate® 12:00 p.m.美国太平洋时间2017年6月30日.  Offerors intending to submit an Offer but who do not yet have an existing account must first register to create a username/password to receive access to the event. PowerAdvocate®征集网站可在以下网址访问:

http://www.poweradvocate.com/pR.do?okey=69061&pubEvent=true 

RFO沟通

All questions or other communications regarding this RFO should be submitted via e-mail to (电子邮件保护). You MUST CC独立评估人,哈罗德·贾德 (电子邮件保护). SDG&E will not accept questions or comments in any other form, except at the bidder’s Conference.  Questions submitted after the deadline as specified in RFO Schedule will only be answered at the sole discretion of SDG&E or the IE.  All questions and their answers will be posted publicly on this website anonymously after receipt.  Respondents are encouraged to check this RFO Website periodically for updates, notices, and postings.

投标人的会议

SDG&E将通过网络会议召开一次投标人会议.  Participation in the conference call is not mandatory for those ultimately submitting a proposal.

When: June 13, 2017
Time:下午1:30 - 3:30 PPT
Audience link:  http://engage.vevent.com/rt/sandiegogasandelectriccompany~061317
免费拨号: 855-851-0422
Conference ID: 6902249837

投标前网络会议演示

The audio of the bidder’s conference will be posted as soon as possible after the conference.  要访问它,请使用原始事件链接.

2017 RAM VII时间表

以下时间表和截止日期适用于本RFO.  SDG&E保留在SDG中随时修改此时间表的权利&E自行决定.  Respondents are responsible for monitoring the RFO Website for updated schedules and possible amendments to the RFO or the solicitation process.  有关详细的时间表,请参阅每种产品类型的协议.

No.

ITEM

DATE

1. 

RFO Issued

June 2, 2017

2. 

投标人的会议

June 13, 2017

3. 

提交问题的截止日期

June 22, 2017

4. 

所有问题的答案将发布在可持续发展目标上&E’s website

June 26, 2017

5.

提交报价的截止日期/截止日期
优惠必须在下午12点之前上传到PowerAdvocate®.M. (NOON PPT).

June 30, 2017

6.

通知中标人和或有投标人

2017年8月25日晚,或可持续发展目标决议后21天&E’s AFM and PFM

7.

中标人应发出的接受/退出信,注明:
a)退出可持续发展目标&E’s solicitation; OR
b) Acceptance of standing as a winning bid; withdrawal from participating in any other solicitation and evidence of withdrawal notice to all other solicitors

以2017年9月1日或步骤6后7天的较晚日期为准

8.

SDG&E向落选的应答者发出感谢通知

2017年9月22日或步骤7后21天的较晚日期

9.

Execute PPs

2017年9月22日或步骤7后21天的较晚日期

10.

SDG&E向CPUC提交带ppa的Tier 2建议信以获得批准

大约在2017年10月20日

11.

预期的CPUC批准(在任何上诉和/或暂停之前)

大约在2017年12月14日

不同商业企业的参与

SDG&E鼓励多元化企业(" DBEs "), “Women-Owned Businesses” or “Minority-Owned Businesses” or “Disabled Veteran Business Enterprises” as defined in G.O. 156[1],参加本RFO. 

Furthermore, SDG&E encourages developers to utilize DBEs during various stages of project development and construction. As a part of G.O. 156, SDG&E will require developers to identify and verify their DBE contractor/subcontractor spending if any.

关于可持续发展目标的更多信息&E的DBE计划和使用DBE可以在以下网址找到:

http://www.sempra.com/about/supplier-diversity/

http://www.cpuc.ca.gov/puc/supplierdiversity/

SDG&E’s DBE Program representatives will provide a presentation during the bidders’ outreach event.  各发展机构可通过联系可持续发展目标要求获得更多信息&E at (电子邮件保护).

常见问题

581.00 KB
DOC
RAM VII协议文档
RAM VII协议文档
459.94 KB
XLSX
Offer Form
Offer Form
243.17 KB
DOCX
RAM电源购买协议
RAM电源购买协议
809.80 KB
PPTX
投标前网络会议演示
投标前网络会议演示
377.51 KB
PDF
常见问题
常见问题